Merkaba,
The building is an industrial zoning, and already has two special use permits on it, with fairly limited parking.
The main issues with acquiring the special use permit were parking, occupant load, and all of the fun things that come with having a high occupant load. Extra bathrooms, emergency exits, etc.
Throw into the mix that the tenant is a lying Deacon (not trying to be facetious), and it has made for an extremely long process.